Ir para o conteúdo
Portal
PTEN-GBENES
Portal
PTEN-GBENES
Polimix Concreto
HomeAboutPlantsConcreteServicesSustainabilityQuoteContact

Social media

  • Facebook
  • Instagram
  • Twitter
  • LinkedIn
  • YouTube
About
  • Who we are
  • Polimix organization
  • Privacy policy
Location
  • Our plants
Concrete
  • Concrete types
  • Placing tips
Services
  • Our services
Projects
  • Main uses
  • Small jobs
Quote
  • Request a quote
Social and environmental
  • Environment
  • Social
  • Formare
News
  • Our news
Contact
  • Careers
  • Questions
  • Suppliers
Other businesses
  • Other businesses

We accept:Visa, Elo, MastercardHipercard, American Express

©2023 Polimix Concreto - All rights reserved

ABNT e ABESC50 anos Polimix
Placing tips

Placing tips

Practical guidance published for teams receiving concrete. It does not replace the design or the site procedure.

  1. 1. Calculate volume from the real element

    Check thicknesses, especially slabs. A small change in height changes the ordered volume.

  2. 2. Concrete arrives ready to place

    Ordering ready-mix removes the separate purchase of cement, aggregates and mixing equipment.

  3. 3. Slump changes go through the plant

    If the site needs another consistency, the request goes to the plant.

  4. 4. Do not add water on site

    Water beyond the dosage makes spreading easier and lowers strength.

  5. 5. Prepare for arrival

    Wet absorbent surfaces before placing and organize circulation over the slab.

  6. 6. Check the truck seal

    The drum seal should match the number on the delivery document.

  7. 7. Respect the handling time

    The published guidance limits handling to about two and a half hours after the truck leaves the plant.

  8. 8. Be careful with the finish

    Excessive troweling and dusting cement encourage surface cracks.

  9. 9. Cure for at least seven days

    The published curing guidance recommends at least seven days, including cloudy and windy days.